90-second product walkthrough
From exception to verified recovery.
One well. One evidence packet. One named approval. One outcome checked against the physical signal.
Demo environment · demo data · simulated recovery · DRY_RUN handoff
Silent-first · captions included
Read the walkthrough
- Seven raw alarms resolve to one underlying failure and one decision row.
- The operating map explains what is physically connected.
- Evidence, operating limits, and the last verified fix arrive together.
- Every claim is marked grounded, partial, or unsupported; missing evidence stays visible.
- An engineer challenges the recommendation and the plan visibly changes.
- A named production foreman reviews and approves the action.
- A structured handoff is recorded while the Maximo connection remains in DRY_RUN. Nothing posts to a vendor system.
- Field work completing is recorded separately from recovery; until the signal is checked, the outcome stays unmeasured.
- In this demo world, recovery is then checked against the physical signal and written to the outcome ledger. A signal that does not return inside its band closes as not recovered.
Illustrative demo world. All figures are demo data. No live CMMS write is represented.
RealAware